The Climotion system was installed in Terminals A, B and C
Result:
Terminal A: 70% less heat consumption, 30% less cold consumption
Cologne airport, Germany
Before reconstruction:
Temperature over 30° inside the terminal in the summer
Objective:
Reduce the temperature in summer
Implemented solution:
Switching completely to Climotion
Partial use of the air conditioning system
Total refusal of fan coils
Result:
Heat curtains are disabled
Maintaining a temperature of 25°С
Bauerfeind factory, Germany
Objective:
Reduce electricity costs
Implemented solution:
Climotion system installation for ventilation control
Result:
The production premises are heated evenly (21-22°С)
Air quality has improved significantly
Less time for heating of premises
Alliander office in Deuven, Netherlands
Objective:
Reduce the cost of electricity in a modern complex of 6 buildings, including in the atrium, as well as provide sufficient comfort for people
Implemented solution:
Climotion system installed
Result:
With the help of the Climotion system, the same temperature regime was established throughout the complex, including the atrium, where, as a rule, contrasting climatic zones are formed. Savings on electricity by 30-40%
New IKEA store in Orléans, France
Objective:
Make it possible to control the temperature and air quality, as well as reduce the cost of air conditioning
Implemented solution:
Climotion system installed
Result:
Savings on electricity by 30-40% compared with traditional ventilation systems, increased visitor comfort
Mannheim Castle, Germany
Objective:
Upgrade the ventilation system of the second largest castle in Europe
Implemented solution:
Climotion system installed
Result:
The ventilation system heats, cools and dehumidifies air, the air flow is halved, the system is absolutely insensitive to visitors. Unique climate conditions for the preservation of interiors have been created
ERGO Insurance Company office
Objective:
Upgrade the building with the adaptation to the existing 2-pipe ventilation system. The main building was built in 1988/89
Implemented solution:
The building is integrated with the Climotion system
Result:
The multiplicity and volume of air are reduced. Increased comfort and a new concept of premises. Energy saving: about 70% on electricity and approx. 30% on heating
University of Groningen, Netherlands
Objective:
Upgrade the existing ventilation system taking into account the growing number of training places from 1700 to 2700
Implemented solution:
Climotion system installed
Result:
The Climotion system provides the University library with a sufficient amount of fresh air, and also saves up to 20%
Starlight Express Theater (Bochum, Germany)
Objective:
Upgrade the ventilation system, the volume of the hall is about 24000 м3
Create comfortable conditions for viewers
Implemented solution:
Installation and integration of the Climotion system into the existing building dispatching system
Result:
High quality of air
Energy saving - 50%
No temperature stratification
DOMunder Archaeological Museum in Utrecht, Netherlands
Objective:
Provide a comfortable atmosphere throughout the museum, which is located underground, without the need to purge the underground space with air under pressure
Implemented solution:
Climotion system installed
Result:
Creation of a conducive climate in the underground space, prevention of air pollution and accumulation of moisture and mold formation
De Lawei theatre in Drachten, Netherlands
Objective:
The object was in the process of modernization, so there was a requirement to quickly study the existing project and consider the possibility of installing the Climotion system
Implemented solution:
Climotion system installed
Result:
The Climotion system was integrated into the existing system and with the rest of the equipment resulted in the creation of an ultra-modern climate control system, which increased the comfort of visitors
University of Applied Sciences Hanse, Netherlands
Objective:
Adapt climate systems of the university to a growing number of students, as well as modernize existing climate equipment, taking into account modern requirements
Implemented solution:
Climotion system installed
Result:
The system was introduced into the complex of the University buildings, taking into account its status as an architectural monument. The installation of the Climotion system required minor changes during installation and avoided significant costs